Sonoco Implements MPS and Delights Customer - Performance Solutions by Milliken
-
Qui sommes-nous ?
-
Menu principal
- Qui sommes-nous ?
- Vue d'ensemble
- Histoire
-
Actualités
-
Qui sommes-nous ?
- Actualités
- Actualités
- Blog
- Dirigeants
- Fondation
- Sites
- Nous contacter
-
Entreprises
-
Menu principal
- Entreprises
- Aperçu de nos activités
- Textile
- Chimie
- Revêtements de sol
-
Solutions de performances par Milliken
-
Entreprises
- Solutions de performances par Milliken
- Vue d'ensemble
- Consulting Services
- Education and Events
- Resources
- Virtual Tour
- Contact Us
- Des produits
-
Industries
-
Menu principal
- Industries
- Aperçu de nos industries
- Agriculture
- Vêtements
- Automobile et transport
- Construction et infrastructures du bâtiment
- Revêtements, peintures et encres
- Espace commercial
- Biens de consommation
- Éducation
- Énergie et services publics
- Gouvernement et défense
- Soins de santé et sciences de la vie
- Hospitalité
- Fabrication
- Emballage et impression
- Espaces résidentiels
-
Durabilité
-
Menu principal
- Durabilité
- Vue d'ensemble
- Rapports
- Éthique
- Actualité
- Carrières
Consumer Packaging Company Implements Performance System and Delights Customer
Consumer Packaging Company Implements Performance System and Delights Customer
Client Company: Sonoco is a $5 billion global provider of consumer packaging, industrial products, and packaging supply-chain services. Performance Solutions has worked with Sonoco in the United States and Europe since 2012. This case study examines work with a unionized plant in Poland, which handles 1.1 billion packs of razors annually on 60 lines. A nine-year-old greenfield operation, the facility assembles razor-package components (provided by a customer) and then seals, sorts, and labels packages and cases. These operations are labor-intensive, requiring 1,200 full-time employees and another 800 temporary workers (to support new product launches, equipment start-ups, and seasonality).
Download this case study to learn:
- The challenges Sonoco faced in supporting and advancing improvements efforts and engaging their entire workforce
- How Sonoco achieved 12 percentage points of improvement in overall equipment effectiveness and 88% breakdown elimination among other significant improvements.
- What it’s like to work with Performance Solutions Practitioners